FONDUL PENTRU MODERNIZARE

Accelerăm tranziția spre neutralitate climatică

https://modernisationfund.eu/
Logo specific pentru pagină

Turceni Photovoltaic Park

Solar energy is the cleanest and richest renewable energy source available. It is time to build around it the Turceni Photovoltaic Park, with an installed capacity of ~ 112 MWp.

Location

The park will be built on the closed, compact slag and ash dump Valea Ceplea, located in Turceni, Gorj County, longitude 23.42 E and latitude 44.66 N.

Project Name

Construction of a Photovoltaic Park on the closed S.E. ash and slag disposal site. Turceni

Project Value

The total value of the Project is RON 499.270.753 (RON equivalent of EUR 100.582.367), of which the maximum amount secured from the Modernisation Fund is RON 349.489.528 (RON equivalent of EUR 70.407.657 - 70% of the total value of the Project).

Location

The Turceni Photovoltaic Park will be built on the closed, compact Valea Ceplea slag and ash disposal site, located in Turceni, Gorj County, longitude 23.42 E and latitude 44.66 N.

Denumire Proiect

Investment Technical Performance Indicators

Indicator name Unit of measure Target value
Installed operational renewable energy capacity - MWp MWp 111,68
Greenhouse gas reduction -tCO2/year tCO2/year 114,706
Average renewable energy production - MWh/year MWh/year 130,645

Main project activities

Activity Start End
Financing contract 2022 2023
Contracting procedures 2023 2024
Execution of works 2024 2025
Design
Execution of works
Commissioning
2024
2024
2025
2024
2025
2025
Communication, information and publicity 2023 2026

A project developed by:

Supported by: