FONDUL PENTRU MODERNIZARE

Accelerăm tranziția spre neutralitate climatică

https://modernisationfund.eu/
Logo specific pentru pagină

Pinoasa Photovoltaic Park

Solar energy is the cleanest and richest renewable energy source available. It is time to build around it the Pinoasa Photovoltaic Park, with an installed capacity of ~ 66 MWp.

Location

The park will be built on the Pinoasa outer halt, in Pinoasa, Gorj county, longitude 23.13 E and latitude 44.85 N.

Project Name

Construction of a Photovoltaic Park on the Pinoasa pit - quarry mining unit

Project Value

The total value of the Project is RON 339,681,918 (RON equivalent of EUR 68,431,830), of which the maximum amount secured from the Modernisation Fund is RON 237,777,342 (RON equivalent of EUR 47,902,281 - 70% of the total value of the Project).

Location

The Pinoasa Photovoltaic Park will be built on the outer Pinoasa halt, in Pinoasa, Gorj County, longitude 23.13 E and latitude 44.85 N.

Denumire Proiect

Investment Technical Performance Indicators

Indicator name Unit of measure Target value
Installed operational renewable energy capacity - MWp MWp 65,78
Greenhouse gas reduction -tCO2/year tCO2/year 67,724
Average renewable energy production - MWh/year MWh/year 77,135

Main project activities

Activity Start End
Financing contract 2022 2023
Contracting procedures 2023 2024
Execution of works 2024 2025
Design
Execution of works
Commissioning
2024
2024
2025
2024
2025
2025
Communication, information and publicity 2023 2026

A project developed by:

Supported by: