Design, procurement, execution, commissioning, operation and maintenance for three years and handover of photovoltaic power plants on slag and ash dumps of the energy branches and on the dumps of the mining branch, including the connection facilities to the national energy system:
Lot 1 – Design, procurement, execution, commissioning, operation and maintenance for 3 years and handover of the SE Turceni photovoltaic power plant with a minimum installed capacity of 111.68 MWp, including the 400/33 kV substation
Lot 2 – Design, procurement, execution, commissioning, operation and maintenance for 3 years and handover of the photovoltaic power plant SE Rovinari with a minimum installed capacity of 83.35 MWp, including the 220/33 kV substation
Lot 3 – Design, procurement, execution, commissioning, operation and maintenance for 3 years and handover of the Bohorelu photovoltaic power plant with a minimum installed capacity of 19.21 MWp
Lot 4 – Design, procurement, execution, commissioning, operation and maintenance for 3 years and handover of the Pinoasa photovoltaic power plant with a minimum installed capacity of 65.78 MWp
Main CPV code
45251100-2 Construction work for power plants